The process
How a dock gets built
Eight stages, in the order they actually happen. Every project runs on its own clock, but it passes through all of them.
-
1
Project intake
We meet you on the water. Site, boat, budget and the water you actually have — before anything is drawn.
-
2
Dimensional site survey
Depth, bottom composition and the seasonal water line, measured rather than assumed. This is what stops surprises at piling stage.
-
3
Technical development
Load path, pile spacing and the hardware schedule. Every span is sized for the boat it will actually carry, not a catalogue average.
-
4
Permitting
Anyone building within or on the banks of Florida surface waters needs a permit. We handle the submission and track it to approval — one week on a simple job, one to two months on a complex one.
-
5
Fabrication
Cut, drilled and coated before it reaches the water. Marine-grade hardware specified to outlast the salt, because the fasteners fail first.
-
6
Pile driving
We own and operate the equipment. Every piling is driven to refusal, which guarantees no piling will ever sink past the point it was driven.
-
7
Structure and decking
Framing, decking, roofs and lifts, in materials chosen for Florida's harsh saltwater environment.
-
8
Handover
Once the permit is issued we allocate a crew, and once we are on site we do not leave until the job is complete. Walkthrough, warranty and a maintenance interval you can keep.
Same process, every job
Different jobs, same standards
Docks
Fixed docks, floating docks, gangways and ramps, sized around the boat you run and the water you have.
See docks →Bulkheads
Shoreline held back properly, specified against the soil and the load rather than off a shelf.
See bulkheads →Boathouses
Covered berths drawn to read as an extension of the house, not an outbuilding parked on the water.
See boathouses →Boat lifts
Rated for the vessel, built for years of trouble-free use in saltwater.
See boat lifts →Seawalls
The line between your property and the water — the one thing you cannot afford to have fail.
See seawalls →Marine pile driving
Just the pilings, driven to refusal with our own equipment.
See marine pile driving →Next step
Start at stage one
The first stage is a conversation on your dock. Book it.